Heath-consultants Gas Delivery Unit (GDUnet) Uživatelský manuál Strana 92

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 109
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 91
USER HANDBOOK
5-10
5.3.1 Test / Calibration Procedure

calibrating an instrument.
1. Ensure correct hardware installation has taken place, refer to
net Installation Guide, part no. 14766.
2. Ensure  net software installation has taken place,
refer to chapter 2 -  net Installation.
3. net, refer
to chapter 3 -  net Operation.
4. Ensure GDUnet Results Manager installation and setup has
net Results Manager.
5. The procedure for the testing or calibrating of an instrument
is illustrated in Fig. 5-12. The test procedure shows each step
taken during the testing of an instrument from inserting onto
net until the removal of the instrument.
Note: The test procedure also forms the quick
operation guide shipped with the GDUnet, part
no. 14768.
Warning: The GDUnet may reset if there is an interruption
in the communications between the GDUnet and
instrument under test. This interruption may be
due to the instrument battery power being low,
dirt in the optical communication windows, or
electromagnetic interference.
Zobrazit stránku 91
1 2 ... 87 88 89 90 91 92 93 94 95 96 97 ... 108 109

Komentáře k této Příručce

Žádné komentáře